Our Clients Receive the DMC Estimating and Project Management Platform V11.0 for Free (A $5,995 value). Email dmc@millworkconsultant.com for information
DMC Millwork Consultation
Seminars in Contract Negotiation, Estimating, Project Management, Purchasing, and Total Company Integration.
Total Company Integration Analysis Provided, Efficiency Advising, Sales, Project Management, Candidate Searches & Estimating.
Contact: dmc@millworkconsultant.com
Office: 719-488-2759, Mobile 719-755-8897
DMC has designed the only ERP platform for estimating and project management based upon total integration of your company.
Version 11.0 has been released. There are now 35 tabs and reports, including three sample contracts, proposal forms, a casework and countertop pricing library, and many more reports. And now, instructions are included as a tab.
DMC's ERP Platform (Enterprise Resource Planning)
The platform . . . Why 35 Tabs / Reports?
1. Each report provides a critical function.
2. Reports are based upon proper estimating and project management needs.
3. Reports are all linked to each other, making it easy to manage a project, adding more profit.
4. The reporting simplifies the entire estimating and project management process, with automatic proposal creation.
Here are the 35 Tabs and Reports:
HOME Est and PM
Project Info (NEW)
Library (Add and Edit Items With Ease)
RFI Log
Alternates
The Proposal
Subcontract Template (Furnish and Install)
Purchase Order (Furnish only)
Subcontract Template (Install Only)
The Critical Path Report (CPR)
Submittal Hour Report
Transmittal Tracker (NEW)
Material Costs Report
Purchasing Tab (Includes System for Writing a P.O.)
Cut List Form
Project Hours Report
Shop Hours Report
Install Hours Report
Shipping Ticket
G702 (Invoicing)
G703 Schedule of Values (Invoicing)
The Close-out and Punch List Report
The Profit and Loss Report Per Item
Production Schedule For Entire Shop or Specific to Project
Daily Field Report
PLUS:
Quality Assurance Reports For:
Milling (NEW)
Assembly (NEW)
Sanding (NEW)
Finishing (NEW)
Pack/Load (NEW)
Unload (NEW)
Install (NEW)
Check-List to Verify Estimate Accuracy
File Organization Suggestion
Forms and Instructions Tab
Each estimated item is broken down by the following categories:
1. Itemized Functions;
2. Project Management Hours per Item;
3. Engineering Hours Per Item;
4. Material Costs Per Item;
5. Special material purchases per item;
6. Equipment rental if needed per item;
7. Mill hours per item and function;
8. Assembly hours per item and function;
9. Sanding per item and function;
10. Total shop hours per function, total item, and total project;
11. Total engineering and project management labor rate per function, item, and total project;
12. Rate can be changed, automatically. Rate can be changed automatically, per item or total project, with all totals automatically changed;
13. Total shop, pre-finished labor rate per function, item and total project. Rate can be changed automatically, per item or total project, with all totals automatically changed;
14. Total engineering, project management, all shop labor with the ability to change the hourly rate;
15. Total dollar pre-finished cost;
16. Cost per function, item and total project for finishing materials;
17. Hours per function, item and total project for finishing;
18. Dollar costs for finishing, easily adjustable, changing the total function, item, and total project with ease;
19. Total dollar and hours for finishing, per function, item and total project;
20. And many more categories per function, item, and total project: total costs for finishing, packing and loading costs, freight, unloading and distribution costs, installation costs per item and total (fully adjustable), total fabrication and installation per function, item and total, total cost for job site meals and lodging per item, adjustable overhead, adjustable profit, tax column, & grand total per function, item and total project.
© 2024. All rights reserved.